Forums
New posts
Search forums
Members
Current visitors
New profile posts
Search profile posts
What's new
New posts
New profile posts
Latest activity
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Off Topic
Off Topic Discussions
Different kind of Build thread
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="ossagp" data-source="post: 162215" data-attributes="member: 1650"><p>All those little pink flags remind me of the ones my son laid out 3 years ago so he could scrape off the land that he is building the house on that he is going to put me in when I can't work anymore. He put a really nice and livable 600 foot cabin (said cabin has granite counter tops and enough lighting to anneal welds with). Since then we dug a 1200 foot basement and put in 6 inches of insulation and then laid floor heat and covered it with steel and concrete within the footers. 8" foam block forms (way faster than using plywood to build forms) came next and we put 2x12 walls up, beams went in to hold the floor, the floor went on (1200 sq foot upper). that is as far as we got. Then dang it he started moving about 200 miles drive to the north and is having one build for himself since his wife wont wait!! I dont think she wants to live by us.</p></blockquote><p></p>
[QUOTE="ossagp, post: 162215, member: 1650"] All those little pink flags remind me of the ones my son laid out 3 years ago so he could scrape off the land that he is building the house on that he is going to put me in when I can't work anymore. He put a really nice and livable 600 foot cabin (said cabin has granite counter tops and enough lighting to anneal welds with). Since then we dug a 1200 foot basement and put in 6 inches of insulation and then laid floor heat and covered it with steel and concrete within the footers. 8" foam block forms (way faster than using plywood to build forms) came next and we put 2x12 walls up, beams went in to hold the floor, the floor went on (1200 sq foot upper). that is as far as we got. Then dang it he started moving about 200 miles drive to the north and is having one build for himself since his wife wont wait!! I dont think she wants to live by us. [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Off Topic
Off Topic Discussions
Different kind of Build thread
Top